Before you sign with a finishing contractor in Egypt, you usually choose between two ways of paying: a fixed-price bill of quantities (BOQ) or a cost plus contract. Both can work well. The right one depends on how settled your design and materials are, and how much flexibility you want during the build.
What is a fixed-price BOQ?
A BOQ (bill of quantities) lists every item of work with its description, unit, quantity, unit price and total. In a fixed-price contract those unit prices are agreed upfront. If material prices go up during the project, the contractor carries that risk for the items in the BOQ. Changes you ask for later are priced and approved as variations.
What is cost plus?
In a cost plus contract you pay the actual cost of the project as shown on invoices — materials, subcontractor labour and any other agreed expenses — plus a management fee agreed in the contract. The fee covers design coordination, management, supervision and daily follow-up. You see every invoice, and you can choose or change materials as the work progresses.
Side-by-side comparison
| Fixed-price BOQ | Cost plus | |
|---|---|---|
| Price | Agreed upfront per item | Actual cost + agreed fee |
| Material flexibility | Lower | Higher |
| Transparency | Items and quantities in writing | Every invoice visible |
| Price-increase risk | On the contractor | On the client |
| Best for | A final number from day one | Choosing materials during the build |
Which one should you choose?
If your design is finished and every material is named by brand and model, a fixed-price BOQ gives you certainty. If you still want to pick materials on site, or prices are moving fast, cost plus is usually fairer to both sides — as long as invoices are open and approvals are clear.
What must be in writing either way
- A full scope: items, quantities and materials by brand, model and size.
- Exclusions: what is not included (for example appliances, kitchen, wardrobes, AC or compound fees).
- For cost plus: the fee, what it is calculated on, how and how often you see invoices, and who approves materials before purchase.
- Payment stages linked to construction milestones.
- Timeline and warranty.
How we work at Cylesta
We offer both models. In both, we issue a written BOQ with items, quantities and named materials before work starts, with exclusions, staged payments, a timeline and a one-year workmanship warranty. See our pricing and contract options.
Frequently asked questions
What does cost plus mean in finishing?
You pay the actual cost of materials and labour by invoice, plus a management fee agreed in the contract.
Which is cheaper, cost plus or fixed price?
There is no single answer. Fixed price protects you from price increases; cost plus can cost less if materials change or prices fall.
Can I switch materials in a fixed-price contract?
Yes, as a variation: the change is priced and approved in writing before it is carried out.
Does Cylesta offer both?
Yes. In both cases you get a written BOQ with named materials before work starts.